Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables
Auteur(s): |
Farshad Peiman
Mohammad Khalilzadeh Nasser Shahsavari-Pour Mehdi Ravanshadnia |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-12-2022-1170 |
- Informations
sur cette fiche - Reference-ID
10755526 - Publié(e) le:
14.01.2024 - Modifié(e) le:
14.01.2024