Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables
Author(s): |
Farshad Peiman
Mohammad Khalilzadeh Nasser Shahsavari-Pour Mehdi Ravanshadnia |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-12-2022-1170 |
- About this
data sheet - Reference-ID
10755526 - Published on:
14/01/2024 - Last updated on:
14/01/2024