Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs
Author(s): |
Xin Zou
Lihui Zhang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-09-2023-0910 |
- About this
data sheet - Reference-ID
10811775 - Published on:
17/01/2025 - Last updated on:
17/01/2025