Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs
Auteur(s): |
Xin Zou
Lihui Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-09-2023-0910 |
- Informations
sur cette fiche - Reference-ID
10811775 - Publié(e) le:
17.01.2025 - Modifié(e) le:
17.01.2025