- (2024): A Constraint Programming Approach for Discrete Time–Cost Tradeoff Problems in a Time-Constrained Activity Network. Dans: Buildings, v. 14, n. 7 (2 juillet 2024).
- Analysis of GMT Composite Material-based Building Formwork. Dans: Journal of Physics: Conference Series, v. 2510, n. 1 (1 juin 2023). (2023):
- Resource-constrained repetitive project scheduling with soft logic. Dans: Engineering, Construction and Architectural Management. :
- Ancient papyrus scroll-inspired self-deployable mechanism based on shape memory polymer composites for Mars explorations. Dans: Composite Structures, v. 304 (janvier 2023). (2023):
- World’s first application of a self-deployable mechanism based on shape memory polymer composites in Mars explorations: ground-based validation and on-Mars qualification. Dans: Smart Materials and Structures, v. 31, n. 11 (septembre 2022). (2022):
- Multiobjective Robust Optimization Model for Generating Stable and Makespan-Protective Repetitive Schedules. Dans: Journal of Construction Engineering and Management, v. 148, n. 9 (septembre 2022). (2022):
- Time-cost optimization in repetitive project scheduling with limited resources. Dans: Engineering, Construction and Architectural Management, v. 29, n. 2 (mai 2021). (2021):
- Work continuity constraints in repetitive project scheduling considering soft logic. Dans: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021). (2021):
- Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Dans: Engineering, Construction and Architectural Management, v. 27, n. 10 ( 2020). (2020):
- A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic. Dans: Automation in Construction, v. 109 (janvier 2020). (2020):
- Modeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 1 (janvier 2018). (2018):
- Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 4 (juillet 2016). (2016):
- Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Dans: Journal of Construction Engineering and Management, v. 145, n. 3 (mars 2019). (2019):
- Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration. Dans: Journal of Computing in Civil Engineering, v. 31, n. 3 (mai 2017). (2017):
- Improved Strategy for Resource Allocation in Repetitive Projects Considering the Learning Effect. Dans: Journal of Construction Engineering and Management, v. 140, n. 11 (novembre 2014). (2014):
- Hierarchical evaluation of on-site environmental performance to enhance a green construction operation. Dans: Civil Engineering and Environmental Systems, v. 31, n. 1 (janvier 2014). (2014):
- Criticality Comparison between the Repetitive Scheduling Method and the Network Model. Dans: Journal of Construction Engineering and Management, v. 139, n. 10 (octobre 2013). (2013):