Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
Auteur(s): |
Zhi-Xiong Su
Han-Ying Wei Xin Zou Jian-Xun Qi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2019, n. 3, v. 145 |
Page(s): | 04018142 |
DOI: | 10.1061/(asce)co.1943-7862.0001613 |
- Informations
sur cette fiche - Reference-ID
10263593 - Publié(e) le:
01.01.2019 - Modifié(e) le:
01.01.2019