Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Author(s): |
Eul-Bum Lee
Hojung Lee John T. Harvey |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, May 2006, n. 5, v. 132 |
Page(s): | 465-472 |
DOI: | 10.1061/(asce)0733-9364(2006)132:5(465) |
- About this
data sheet - Reference-ID
10155205 - Published on:
11/12/2018 - Last updated on:
11/12/2018