Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study
Auteur(s): |
Eul-Bum Lee
Hojung Lee John T. Harvey |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mai 2006, n. 5, v. 132 |
Page(s): | 465-472 |
DOI: | 10.1061/(asce)0733-9364(2006)132:5(465) |
- Informations
sur cette fiche - Reference-ID
10155205 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018