- Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule. Dans: Journal of Transportation Engineering, v. 131, n. 10 (octobre 2005). (2005):
- Implementation of Automated Travel-Time Information and Public Reaction on Urban Highway Rehabilitation. Dans: Journal of Transportation Engineering, v. 132, n. 10 (octobre 2006). (2006):
- Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis. Dans: Journal of Infrastructure Systems, v. 11, n. 4 (décembre 2005). (2005):
- Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Dans: Engineering, Construction and Architectural Management, v. 27, n. 10 ( 2020). (2020):
- Prediction method of real discount rate to improve accuracy of life-cycle cost analysis. Dans: Energy and Buildings, v. 135 (janvier 2017). (2017):
- Performance evaluation of normalization-based CBR models for improving construction cost estimation. Dans: Automation in Construction, v. 119 (novembre 2020). (2020):
- A Method for Analyzing the Effect of Implementing an Enterprise System Based on the Complexity of Activities. Dans: Journal of Civil Engineering and Management, v. 24, n. 7 (novembre 2018). (2018):
- Analysis of the Causes and Level of Maintenance for Enterprise Systems in Construction Companies. Dans: Journal of Civil Engineering and Management, v. 24, n. 6 (octobre 2018). (2018):
- Geographic Information System–Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items. Dans: Journal of Construction Engineering and Management, v. 145, n. 8 (août 2019). (2019):
- Automated Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA). Dans: International Journal of Transportation Science and Technology, v. 4, n. 1 (mars 2015). (2015):
- Case Study of Urban Concrete Pavement Reconstruction on Interstate 10. Dans: Journal of Construction Engineering and Management, v. 128, n. 1 (février 2002). (2002):
- Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction. Dans: Journal of Construction Engineering and Management, v. 133, n. 10 (octobre 2007). (2007):
- Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study. Dans: Journal of Construction Engineering and Management, v. 132, n. 5 (mai 2006). (2006):
- Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies. Dans: Journal of Construction Engineering and Management, v. 131, n. 4 (avril 2005). (2005):
- State-of-Practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007). (2007):
- Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction. Dans: Journal of Construction Engineering and Management, v. 131, n. 12 (décembre 2005). (2005):
- Learning method for knowledge retention in CBR cost models. Dans: Automation in Construction, v. 96 (décembre 2018). (2018):
- Method for Predicting Raw Material Prices for Product Production over Long Periods. Dans: Journal of Construction Engineering and Management, v. 145, n. 1 (janvier 2019). (2019):