0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule

Auteur(s): (PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.)
(PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.)
(PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Transportation Engineering, , n. 10, v. 131
Page(s): 752-761
DOI: 10.1061/(asce)0733-947x(2005)131:10(752)
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)0733-947x(2005)131:10(752).
  • Informations
    sur cette fiche
  • Reference-ID
    10634660
  • Publié(e) le:
    29.11.2021
  • Modifié(e) le:
    29.11.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine