Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule
Author(s): |
Eul-Bum Lee
(PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.)
David Thomas (PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.) Loren Bloomberg (PhD, PMP, Research Engineer, Univ. of California at Berkeley, Institute of Transportation Studies, Building 452 (PRC), 1353 S. 46th St., Richmond, CA 94804.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Transportation Engineering, October 2005, n. 10, v. 131 |
Page(s): | 752-761 |
DOI: | 10.1061/(asce)0733-947x(2005)131:10(752) |