0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Factors causing cost overruns in public hospital construction in developing countries: a case from Vietnam

Author(s): (Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam)
(Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam)
(Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam)
(Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam)
Medium: journal article
Language(s): English
Published in: Journal of Asian Architecture and Building Engineering
Page(s): 1-15
DOI: 10.1080/13467581.2024.2357196
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/13467581.2024.2357196.
  • About this
    data sheet
  • Reference-ID
    10788221
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine