Factors causing cost overruns in public hospital construction in developing countries: a case from Vietnam
Auteur(s): |
Nhat Minh Huynh
(Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam)
Anh Tuan Le (Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam) Long Le-Hoai (Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam) Huu Tho Nguyen (Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Ho Chi Minh City, Vietnam) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Asian Architecture and Building Engineering |
Page(s): | 1-15 |
DOI: | 10.1080/13467581.2024.2357196 |