0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Factors causing cost overruns in public hospital construction in developing countries: a case from Vietnam

This publication lists 63 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10788221
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine