0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Extension Hieflau HEP - Economical Solutions for the Headrace Tunnel

Author(s):


Medium: journal article
Language(s): English
Published in: Geomechanik und Tunnelbau, , n. 6, v. 1
Page(s): 576-581
DOI: 10.1002/geot.200800064
Abstract:

The expansion project for the Hieflau hydropower plant involves the construction of a second headrace tunnel to enhance the capacity from 60 up to 90 m³/s. The second tunnel, located between the weir system Gstatterboden and storage reservoir Wag, is seen as the highlight of the enhancement scheme. The breakthrough of the 4.9 km long TBM-drive is expected by end of this year.

Available from: Refer to publisher

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200800064.
  • About this
    data sheet
  • Reference-ID
    10031944
  • Published on:
    20/01/2009
  • Last updated on:
    15/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine