Extension Hieflau HEP - Economical Solutions for the Headrace Tunnel
Auteur(s): |
A. Walter
W. Weber F. Gappmaier |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Geomechanik und Tunnelbau, 2008, n. 6, v. 1 |
Page(s): | 576-581 |
DOI: | 10.1002/geot.200800064 |
Abstrait: |
The expansion project for the Hieflau hydropower plant involves the construction of a second headrace tunnel to enhance the capacity from 60 up to 90 m³/s. The second tunnel, located between the weir system Gstatterboden and storage reservoir Wag, is seen as the highlight of the enhancement scheme. The breakthrough of the 4.9 km long TBM-drive is expected by end of this year. |