Enlarging a large-diameter shield tunnel using the Pile–Beam–Arch method to create a metro station
Author(s): |
Jun Liu
Fang Wang Shaohui He Enzhi Wang Hong Zhou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, June 2015, v. 49 |
Page(s): | 130-143 |
DOI: | 10.1016/j.tust.2015.04.006 |
- About this
data sheet - Reference-ID
10090002 - Published on:
29/11/2018 - Last updated on:
29/11/2018