0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Enlarging a large-diameter shield tunnel using the Pile–Beam–Arch method to create a metro station

This publication has been cited in the following 19 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10090002
  • Published on:
    29/11/2018
  • Last updated on:
    29/11/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine