0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Eisenbahntunnelbau in Karstgebieten – Erfahrungen beim Bau der DB Neubaustrecke Nürnberg – Ingolstadt

Author(s):

Medium: journal article
Language(s): German
Published in: Bauingenieur, , n. 6, v. 79
Page(s): 264+
Abstract:

For the first time a high-speed railway line with a slab track is being set up in a largely karstified area through the construction of the new DB route between Nuremberg and Ingolstadt.

Apart from a short description of the project, the various problems and the approaches for their solution for constructing a permanently operationally-safe railway line are dealt with. The paper mainly concerns itself with the detailed exploration using currently available methods, their Interpretation and the differentiated approaches obtained from them for developing the Investigated karst structures. The findings gained in the course of this project for stage-by-stage exploration can be applied for the construction of traffic arteries with high qualitative demands on stability and Standing time in similar geological situations [11].

Structures and Projects

Structure Types

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015465
  • Published on:
    21/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine