Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects

Author(s): ORCID (Associate Professor, Dept. of Civil & Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, Las Vegas, NV 89154 (corresponding author))
(Graduate Student, Dept. of Civil & Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, Las Vegas, NV 89154.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 10
Page(s): 04518018
DOI: 10.1061/(asce)la.1943-4170.0000271
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000271.
  • About this
    data sheet
  • Reference-ID
    10579909
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 