Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
Auteur(s): |
Pramen P. Shrestha
Haileab Zeleke (Graduate Student, Dept. of Civil & Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, Las Vegas, NV 89154.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2018, n. 4, v. 10 |
Page(s): | 04518018 |
DOI: | 10.1061/(asce)la.1943-4170.0000271 |