0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects

This publication has been cited in the following 22 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579909
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine