Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts
Author(s): |
Pramen P. Shrestha
(Professor, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154 (corresponding author))
Ruiko Maharjan (Ph.D. Student, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, November 2019, n. 4, v. 11 |
Page(s): | 04519025 |
DOI: | 10.1061/(asce)la.1943-4170.0000323 |
- About this
data sheet - Reference-ID
10579947 - Published on:
08/03/2021 - Last updated on:
08/03/2021