Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts
Auteur(s): |
Pramen P. Shrestha
Ruiko Maharjan (Ph.D. Student, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2019, n. 4, v. 11 |
Page(s): | 04519025 |
DOI: | 10.1061/(asce)la.1943-4170.0000323 |
- Informations
sur cette fiche - Reference-ID
10579947 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021