Ruiko Maharjan
- Cost, Change Order, and Schedule Performance of Highway Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 1 (February 2022). (2022):
- Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (August 2018). (2018):
- Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 4 (November 2019). (2019):
- Performance of Design-Build and Construction Manager-at-Risk Methods in Water and Wastewater Projects. In: Practice Periodical on Structural Design and Construction, v. 24, n. 1 (February 2019). (2019):