0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering and Architecture, , n. 3, v. 8
Page(s): 297-304
DOI: 10.13189/cea.2020.080313
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.13189/cea.2020.080313.
  • About this
    data sheet
  • Reference-ID
    10611864
  • Published on:
    01/07/2021
  • Last updated on:
    01/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine