Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method
Auteur(s): |
Pungky Dharma Saputra
Yusuf Latief |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering and Architecture, mai 2020, n. 3, v. 8 |
Page(s): | 297-304 |
DOI: | 10.13189/cea.2020.080313 |
- Informations
sur cette fiche - Reference-ID
10611864 - Publié(e) le:
01.07.2021 - Modifié(e) le:
01.07.2021