0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Nugroho, Danang B. / Latief, Yusuf / Wibowo, Mochamad A. / Arifuddin, Rosmariani / Lestari, Fatma / Akram, Muhammad N. (2024): Development of a Framework for Risk-Based Integrated Safety Audit to Enhance Construction Safety Performance. Dans: Civil Engineering Journal, v. 10, n. 3 (1 mars 2024).

    https://doi.org/10.28991/cej-2024-010-03-08

  2. Kussumardianadewi, Bernadette Detty / Latief, Yusuf / Trigunarsyah, Bambang / Rarasati, Ayomi Dita / Widiani, Winny (2024): Development of Work Breakdown Structure (WBS) in High-Rise Office Buildings using Green Retrofitting based on GBCI and Minister of PUPR Regulation No. 21 of 2021 to Improve the Quality of Resource Planning. Dans: Civil Engineering and Architecture, v. 12, n. 2 (mars 2024).

    https://doi.org/10.13189/cea.2024.120207

  3. Inayah Wardahni, Nurul / Sagita Riantini, Leni / Latief, Yusuf / Machfudiyanto, Rossy Armyn (2020): Identification of E-Maintenance Elements and Indicators that Affect Maintenance Performance of High Rise Building: a Literature Review. Dans: IOP Conference Series: Materials Science and Engineering, v. 1007, n. 1 (1 décembre 2020).

    https://doi.org/10.1088/1757-899x/1007/1/012021

  4. Latief, Yusuf / Berawi, Mohammed Ali / Budiman, Rachmat (2017): Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method. Dans: Journal of Physics: Conference Series, v. 877 (juillet 2017).

    https://doi.org/10.1088/1742-6596/877/1/012041

  5. Saputra, Pungky Dharma / Latief, Yusuf (2020): Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method. Dans: Civil Engineering and Architecture, v. 8, n. 3 (mai 2020).

    https://doi.org/10.13189/cea.2020.080313

  6. Wijaya, Luki / Latief, Yusuf / Machfudiyanto, Rossy Armyn (2020): Development of Preventive Maintenance Guidelines for Architectural Components on Government Building Based on Work Breakdown Structure. Dans: Civil Engineering and Architecture, v. 8, n. 3 (mai 2020).

    https://doi.org/10.13189/cea.2020.080315

  7. Putro, Anggoro / Latief, Yusuf (2020): Implementation of Design and Build Contract in Government Building Construction Project Practice. Dans: IOP Conference Series: Materials Science and Engineering, v. 897 (août 2020).

    https://doi.org/10.1088/1757-899X/897/1/012016

  8. Sihombing, Lukas B. / Latief, Yusuf / Rarasati, Ayomi D. / Wibowo, Andreas (2018): Project Financing Models for Toll Road Investments: A State-of-the-Art Literature Review. Dans: Civil Engineering and Architecture, v. 6, n. 3 (mai 2018).

    https://doi.org/10.13189/cea.2018.060301

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine