Development of Preventive Maintenance Guidelines for Architectural Components on Government Building Based on Work Breakdown Structure
Auteur(s): |
Luki Wijaya
Yusuf Latief Rossy Armyn Machfudiyanto |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering and Architecture, mai 2020, n. 3, v. 8 |
Page(s): | 312-319 |
DOI: | 10.13189/cea.2020.080315 |
- Informations
sur cette fiche - Reference-ID
10611872 - Publié(e) le:
01.07.2021 - Modifié(e) le:
01.07.2021