Development of Work Breakdown Structure (WBS) in High-Rise Office Buildings using Green Retrofitting based on GBCI and Minister of PUPR Regulation No. 21 of 2021 to Improve the Quality of Resource Planning
Auteur(s): |
Bernadette Detty Kussumardianadewi
Yusuf Latief Bambang Trigunarsyah Ayomi Dita Rarasati Winny Widiani |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering and Architecture, mars 2024, n. 2, v. 12 |
Page(s): | 740-753 |
DOI: | 10.13189/cea.2024.120207 |
- Informations
sur cette fiche - Reference-ID
10760444 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024