0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of Work Breakdown Structure (WBS) in High-Rise Office Buildings using Green Retrofitting based on GBCI and Minister of PUPR Regulation No. 21 of 2021 to Improve the Quality of Resource Planning

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.13189/cea.2024.120207.
  • About this
    data sheet
  • Reference-ID
    10760444
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine