Pungky Dharma Saputra
- Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method. In: Civil Engineering and Architecture, v. 8, n. 3 (May 2020). (2020):