0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Data‐driven out‐of‐order model for synchronized planning, scheduling, and execution in modular construction fit‐out management

Author(s): (Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China)
(School of Intelligent Systems Science and Engineering Jinan University Zhuhai China)
(Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China)
(Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China)
(Department of Industrial and Systems Engineering The Hong Kong Polytechnic University Hung Hom Hong Kong China)
Medium: journal article
Language(s): English
Published in: Computer-Aided Civil and Infrastructure Engineering, , n. 16, v. 39
Page(s): 2457-2480
DOI: 10.1111/mice.13203
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1111/mice.13203.
  • About this
    data sheet
  • Reference-ID
    10770201
  • Published on:
    29/04/2024
  • Last updated on:
    20/09/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine