Data‐driven out‐of‐order model for synchronized planning, scheduling, and execution in modular construction fit‐out management
Auteur(s): |
Yishuo Jiang
(Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China)
Mingxing Li (School of Intelligent Systems Science and Engineering Jinan University Zhuhai China) Benedict Jun Ma (Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China) Ray Y. Zhong (Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Pok Fu Lam Hong Kong China) George Q. Huang (Department of Industrial and Systems Engineering The Hong Kong Polytechnic University Hung Hom Hong Kong China) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Computer-Aided Civil and Infrastructure Engineering, août 2024, n. 16, v. 39 |
Page(s): | 2457-2480 |
DOI: | 10.1111/mice.13203 |
- Informations
sur cette fiche - Reference-ID
10770201 - Publié(e) le:
29.04.2024 - Modifié(e) le:
20.09.2024