Mingxing Li
- Data‐driven out‐of‐order model for synchronized planning, scheduling, and execution in modular construction fit‐out management. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 39, n. 16 (août 2024). (2024):
- Multistage self-adaptive decision-making mechanism for prefabricated building modules with IoT-enabled graduation manufacturing system. Dans: Automation in Construction, v. 148 (avril 2023). (2023):
- Digital twin-enabled real-time synchronization for planning, scheduling, and execution in precast on-site assembly. Dans: Automation in Construction, v. 141 (septembre 2022). (2022):