0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Data‐driven out‐of‐order model for synchronized planning, scheduling, and execution in modular construction fit‐out management

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10770201
  • Published on:
    29/04/2024
  • Last updated on:
    20/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine