Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
Author(s): |
Alexandros Kallantzis
Sergios Lambropoulos |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, June 2004, n. 3, v. 11 |
Page(s): | 211-222 |
DOI: | 10.1108/09699980410535813 |
- About this
data sheet - Reference-ID
10575985 - Published on:
26/02/2021 - Last updated on:
26/02/2021