Engineering, Construction and Architectural Management - v. 11, n. 3 (June 2004)
Published: | June 2004 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Drew, Derek S. / Tang, Sandy L. Y. / Lui, Christine K. | Balancing fee and quality in two envelope fee bidding | 159-175 |
Kallantzis, Alexandros / Lambropoulos, Sergios | Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling | 211-222 |
Nepal, Madhav Prasad / Park, Moonseo | Downtime model development for construction equipment management | 199-210 |
Thomas Ng, S. / Chow, Lai‐Kit | Evaluating engineering consultants' general capabilities during the pre‐selection process – a Hong Kong study | 150-158 |
Cheah, Charles Y. J. / Garvin, Michael J. | An open framework for corporate strategy in construction | 176-188 |
Love, Peter E. D. / Edwards, David J. / Sohal, Amrik | Total quality management in Australian contracting organisations: pre‐conditions for successful implementation | 189-198 |