Sergios Lambropoulos
- Fund Allocation for Transportation Network Recovery Following Natural Disasters. In: Journal of Urban Planning and Development, v. 133, n. 1 (March 2007). (2007):
- Parametric Model for Conceptual Cost Estimation of Concrete Bridge Foundations. In: Journal of Infrastructure Systems, v. 17, n. 2 (June 2011). (2011):
- Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. In: Engineering, Construction and Architectural Management, v. 11, n. 3 (June 2004). (2004):
- The use of time and cost utility for construction contract award under European Union Legislation. In: Building and Environment, v. 42, n. 1 (January 2007). (2007):
- Multispan Balanced Cantilever Bridges: Egnatia Motorway. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004. (2004):
- Linear versus Network Scheduling: A Critical Path Comparison. In: Journal of Construction Engineering and Management, v. 133, n. 7 (July 2007). (2007):
- Algorithmic Method for Scraper Load-Time Optimization. In: Journal of Construction Engineering and Management, v. 139, n. 5 (May 2013). (2013):
- SEMANTIC: Smart EarthMoving ANalysis and estimation of Cost. In: Construction Management and Economics, v. 14, n. 2 (March 1996). (1996):