0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Critical Gap as a Function of Waiting Time in Determining Roundabout Capacity

Author(s): (Associate Professor, Dept. of Civil Engineering, Technion, Israel Institute of Technology, Haifa 37000, Israel (corresponding author).)
(PhD, Ami-Matom, Engineers, Architects, Surveyors and Consultants Ltd., 28 Hanevim St., Haifa 31044, Israel.)
(Professor, Dept. of Civil Engineering, Technion, Israel Institute of Technology, Haifa 37000, Israel.)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 5, v. 129
Page(s): 504-509
DOI: 10.1061/(asce)0733-947x(2003)129:5(504)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(2003)129:5(504).
  • About this
    data sheet
  • Reference-ID
    10634436
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine