Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation

Author(s):
ORCID



Medium: journal article
Language(s): English
Published in: Buildings, , n. 11, v. 12
Page(s): 2028
DOI: 10.3390/buildings12112028
Abstract:

Construction industries have poor cost performance in terms of finishing projects within a budget. A fuzzy model for evaluating the critical factors of cost overrun for construction projects in China is developed by identifying, classifying and ranking cost overrun factors of the construction industries. Sixty-five cost overrun factors are identified and classified into four clusters (project macro, project management, project environment, and core stakeholders) through a detailed literature review process and a discussion with experts from the Chinese construction industry. A questionnaire survey was conducted for data collection to calculate an index of the project-influenced factors and clusters in the construction industry in China. With the help of the proposed model, it is possible to guide project managers and decision makers to make better informative decisions such as project macro, project management, project environment, and core stakeholders.

Copyright: © 2022 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10699965
  • Published on:
    10/12/2022
  • Last updated on:
    15/02/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine