0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation

This publication lists 69 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10699965
  • Published on:
    10/12/2022
  • Last updated on:
    15/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine