Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation

Auteur(s):
ORCID



Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 11, v. 12
Page(s): 2028
DOI: 10.3390/buildings12112028
Abstrait:

Construction industries have poor cost performance in terms of finishing projects within a budget. A fuzzy model for evaluating the critical factors of cost overrun for construction projects in China is developed by identifying, classifying and ranking cost overrun factors of the construction industries. Sixty-five cost overrun factors are identified and classified into four clusters (project macro, project management, project environment, and core stakeholders) through a detailed literature review process and a discussion with experts from the Chinese construction industry. A questionnaire survey was conducted for data collection to calculate an index of the project-influenced factors and clusters in the construction industry in China. With the help of the proposed model, it is possible to guide project managers and decision makers to make better informative decisions such as project macro, project management, project environment, and core stakeholders.

Copyright: © 2022 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10699965
  • Publié(e) le:
    10.12.2022
  • Modifié(e) le:
    15.02.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine