Contract delay: what is it and how are we performing?

Author(s):
Medium: journal article
Language(s): English
Published in: Australasian Journal of Construction Economics and Building, , n. 1, v. 12
Page(s): 83-91
DOI: 10.5130/ajceb.v12i1.2474
Abstract:

This paper examines the management of contract delays in the construction industry as currently practised, and suggests some best practice alternative methods.Research results about the level of contractor’s time management skills were analysed to determine the related impact on their ability to manage contract delays. A comparison was made between three conditions of contracts used in New Zealand to determine how delay management should be managed with a discussion about how the different contract conditions distribute risk among the parties. Recommendations were made to improve contract conditions, up-skill industry practitioners and ensure student graduates have adequate delay management skills.

License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10338819
  • Published on:
    05/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine