Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Australasian Journal of Construction Economics and Building, , n. 1, v. 12
Seite(n): 83-91
DOI: 10.5130/ajceb.v12i1.2474
Abstrakt:

This paper examines the management of contract delays in the construction industry as currently practised, and suggests some best practice alternative methods.Research results about the level of contractor’s time management skills were analysed to determine the related impact on their ability to manage contract delays. A comparison was made between three conditions of contracts used in New Zealand to determine how delay management should be managed with a discussion about how the different contract conditions distribute risk among the parties. Recommendations were made to improve contract conditions, up-skill industry practitioners and ensure student graduates have adequate delay management skills.

Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10338819
  • Veröffentlicht am:
    05.08.2019
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine