Publié dans: Australasian Journal of Construction Economics and Building, , n. 1, v. 12
Page(s): 83-91
DOI: 10.5130/ajceb.v12i1.2474
Abstrait:

This paper examines the management of contract delays in the construction industry as currently practised, and suggests some best practice alternative methods.Research results about the level of contractor’s time management skills were analysed to determine the related impact on their ability to manage contract delays. A comparison was made between three conditions of contracts used in New Zealand to determine how delay management should be managed with a discussion about how the different contract conditions distribute risk among the parties. Recommendations were made to improve contract conditions, up-skill industry practitioners and ensure student graduates have adequate delay management skills.

License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10338819
  • Publié(e) le:
    05.08.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine