Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness
Author(s): |
Connie Tenin Su
Miguel Cezar Santoro André Bergsten Mendes |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, August 2018, n. 8, v. 144 |
Page(s): | 04018074 |
DOI: | 10.1061/(asce)co.1943-7862.0001524 |
- About this
data sheet - Reference-ID
10174809 - Published on:
01/12/2018 - Last updated on:
01/12/2018