0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

André Bergsten Mendes

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Su, Connie Tenin / Santoro, Miguel Cezar / Mendes, André Bergsten (2018): Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness. In: Journal of Construction Engineering and Management, v. 144, n. 8 (August 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001524

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine