Miguel Cezar Santoro

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Su, Connie Tenin / Santoro, Miguel Cezar / Mendes, André Bergsten (2018): Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness. In: Journal of Construction Engineering and Management, v. 144, n. 8 (August 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001524