Construction Verification of a Cable-Stayed Arch Cooperative Bridge in China
Author(s): |
Zhang Kexin
(School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China)
Li Dachao (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) He Liu (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) Xue Xingwei (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) Fei Teng (School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, China) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Structures and Buildings, May 2024, n. 5, v. 177 |
Page(s): | 1-37 |
DOI: | 10.1680/jstbu.22.00029 |
- About this
data sheet - Reference-ID
10695811 - Published on:
12/12/2022 - Last updated on:
16/05/2024